Florida Department of Transportaton
Krome Avenue
Preparation of Right-of-Way Control Survey and R/W Map in connection with the widening of Krome Avenue (S.R. 997) from SW 88th Street (Kendall Drive) to SW 8th Street.
Tasks performed by Biscayne Engineering Company included:
- Horizontal and Vertical Project Network Verification
- Re-establish Historic Alignment for S.R. 997
- Establish R/W Lines throughout project
- Perform Sectionalized Land Surveys
- Locate Miscellaneous Topography
- G.P.S. Surveys
- Meeting Attendance
- Title Search Analysis
- Prepare Legal Descriptions
- Prepare Control Surveys
- Prepare R/W Map
Back to Projects