Widening of S.W. 107th Avenue
As part of the re-platting process, Sweet Home Baptist Church is being required to reconstruct a portion of S.W. 107th Avenue from a 2 lane rural roadway to a 4-lane divided urban roadway with left turn bays. Biscayne Engineering Company is providing complete roadway construction plans for this widening including drainage improvements and striping and signage plans.
Additionally, the project includes other improvements including sidewalk replacement, and widening along S.W. 184th Street and construction of half of a 2-lane rural roadway along S.W. 108th Avenue.
Back to Projects