Preparation of Right-of-Way Control Survey and R/W Map in connection with the widening of Krome Avenue (S.R. 997) from SW 88th Street (Kendall Drive) to SW 8th Street. Tasks performed by Biscayne Engineering Company included Horizontal and Vertical Project Network Verification, Re-establish Historic Alignment for S.R. 997, Establish R/W Lines throughout project, Perform Sectionalized Land Surveys, Locate Miscellaneous Topography, G.P.S. Surveys, Meeting Attendance, Title Search Analysis, Prepare Legal Descriptions, Prepare Control Surveys, and Prepare R/W Map.